E03 – Dredging Equipment Design & Cost Estimating

This course applies established dredging-equipment design methods and cost-estimating frameworks, drawn from the source materials, to size dredging plant and translate design decisions into unit project cost. Using worked TSHD and CSD examples, learners move from production targets and site constraints to vessel dimensions, installed power, and cost-per-cubic-metre estimates.

£299.00

1 hour 45 minutes

Focused, self-paced learning designed to fit around professional schedules.

Online, self-paced

Study online at a pace that fits your schedule.

7 sections

Structured curriculum sections.

English

Language of instruction for this course.

Quiz count: 5 total

Knowledge checks and assessed activities.

35 lessons

Focused lessons organised into a clear learning path.

Course overview

This course applies established dredging-equipment design methods and cost-estimating frameworks, drawn from the source materials, to size dredging plant and translate design decisions into unit project cost. Using worked TSHD and CSD examples, learners move from production targets and site constraints to vessel dimensions, installed power, and cost-per-cubic-metre estimates.

What you will learn

Apply the dredger design procedure to translate production targets and boundary conditions into first-pass dredger sizing decisions.

Calculate operational hours, production requirements, and governing boundary conditions for dredging equipment design.

Work through a trailing suction hopper dredger sizing calculation from cycle time to hopper, pump, pipe, and propulsion requirements.

Work through a cutter suction dredger sizing calculation from dredging hours and spillage allowances to cutter power and pontoon dimensions.

Build a dredging cost estimate using USACE pay-prism, time-efficiency, and monthly-cost methods.

Explain how vessel design outputs drive ownership cost, fuel use, and unit dredging cost.

Skills and knowledge

Dredging design

TSHD sizing

CSD sizing

Cost estimating

USACE methods

Production analysis

Marine engineering

Concept design

Course curriculum

Introduction

1.1 Welcome

Dredger Design Method

2.1 Design Inputs
2.2 Governing Constraints
2.3 Sizing Logic
2.4 Feedback Loop
2.5 Section 1 Quiz (quiz)

TSHD Worked Sizing

3.1 Design Brief
3.2 Hours and Cycle
3.3 Hopper and Payload
3.4 Ship Weight Estimates
3.5 Dredging Installation
3.6 Propulsion Power
3.7 Section 2 Quiz (quiz)

CSD Worked Sizing

4.1 CSD Design Brief
4.2 Dredging Hours
4.3 Required Production
4.4 Specific Energy
4.5 Pontoon Dimensions
4.6 Geometry and Forces
4.7 Section 3 Quiz (quiz)

USACE Cost Estimating

5.1 Regulatory Framework
5.2 Pay Prism Terms
5.3 Time Efficiency
5.4 Production Methods
5.5 Monthly Cost Build
5.6 CIRIA Value Method
5.7 Unit Cost Example
5.8 Section 4 Quiz (quiz)

Design-to-Cost Integration

6.1 Design Cost Drivers
6.2 Stability Check
6.3 Formula Reuse
6.4 Combined Example
6.5 Design-to-Cost Assignment
6.6 Section 5 Quiz (quiz)

Summary

7.1 Key Takeaways

Ready to enrol?

£299.00